Single Ply Projects

Single Ply Projects

Handford Hall Sports Dome, Handford Hall Primary School, Ipswich, Suffolk

Client: Suffolk County Council

The deteriorated coverings to this sports dome we in need of refurbishment. It has an 18mm plywood decking, and is now covered in a Sarnafil light grey PVC single ply roofing membrane, bonded in a solvent adhesive, with all laps hot air welded.

Handford Hall Sports Dome Handford Hall Sports Dome Handford Hall Sports Dome Handford Hall Sports Dome Handford Hall Sports Dome Handford Hall Sports Dome

Kirkley Childrens Centre, Kirkley Street, Lowestoft, Suffolk

Client: (via Blackburns (Harleston) Ltd)

A new build project consisting of a high performance felt vapour control layer, 120mm PUR Insulation Board, and new Sarnafil lead grey PVC single ply roofing membrane, fully adhered with a solvent adhesive, with all laps hot air welded. For maximum visual impact, an aesthetic detailing of Sarnafil Décor Profiles were installed to give the effect of a standing seam roof.

Kirkley Childrens Centre Kirkley Childrens Centre Kirkley Childrens Centre Kirkley Childrens Centre Kirkley Childrens Centre Kirkley Childrens Centre

Langley School, Langley, Norfolk

Client: Langley School

The client wanted to infill an area between 2 buildings to create a new dining room space. We installed a new Sarnafil G410-12EL lead grey PVC single ply roofing membrane, fully adhered with a solvent adhesive with all laps hot air welded. In addition, we had to create a new designated walkway using Sarnafil Walkway Tiles.

Langley School, Langley Langley School, Langley Langley School, Langley Langley School, Langley

Lothingland Middle School, Jay Lane, Lothingland, Suffolk

Client: Lothingland Middle School

This project was a Polisystem single ply overlay system. There are 5 different pitched roofs, as shown below, totalling over 1200M2. There is also over 200LM of gutter detail. The job involved preparing the existing coverings, consisting of copper sheet roofing covered with Belzona liquid waterproofing. Once prepared, a single layer roof covering (Polisystem Single Ply) with a fleece back, was fully adhered to it. The gutter detail duplicates this.

Lothingland Middle School Lothingland Middle School Lothingland Middle School Lothingland Middle School Lothingland Middle School Lothingland Middle School Lothingland Middle School Lothingland Middle School Lothingland Middle School Lothingland Middle School Lothingland Middle School Lothingland Middle School

New House, Aldeburgh, Suffolk

Client: Megahart Ltd

This contract was a new build which required a flat roof on it. The system specified was Sarnafil G410-12EL lead grey PVC single ply roofing system. This roof had lots of detail varying from an internal gutter system, to some unusual perimeter details, as shown in the photographs. The specification for the project was a high performance felt vapour control layer, 100mm PUR insulation board, bonded to the deck using a PU adhesive, and a fully adhered single ply membrane.

New House, Aldeburgh New House, Aldeburgh New House, Aldeburgh New House, Aldeburgh New House, Aldeburgh New House, Aldeburgh

Southend Hospital, Southend-on-Sea, Essex

Client: NHS

This project was a new build project, with a corrugated metal decking. The final roof covering on this contract is a Sarnafil light grey single ply roofing system. We also undertook some cladding works to the stairwell on this building as depicted within the photographs.

Southend Hospital Southend Hospital Southend Hospital Southend Hospital Southend Hospital Southend Hospital

Sure Start Centre, Water Lane, Lowestoft, Suffolk

Client: (via M. S. Oakes Ltd)

A new build project consisting of a high performance felt vapour control layer, 120mm PUR Insulation Board, and new Sarnafil lead grey PVC single ply roofing membrane, fully adhered with a solvent adhesive, with all laps hot air welded. We also installed the new powder coated metal fascia and box gutters to match.

Sure Start Centre Sure Start Centre Sure Start Centre Sure Start Centre Sure Start Centre Sure Start Centre

Valley Primary School, Gentry Place, Norwich, Norfolk

Client: NPS Property Consultants Ltd, Aylsham Office

A large refurbishment project which involved removing the existing felt roof coverings, previous asphalt and fibreboard roofing. The concrete deck was then prepared for an overlay with a Sarnafil Self Adhesive Vapour Barrier, 100mm Sarnatherm Insulation, and Sarnafil G410-20EL light grey PVC single ply roofing system, to achieve a 20 year single point insurance backed manufacturer’s warranty.

Valley Primary School Valley Primary School Valley Primary School Valley Primary School Valley Primary School Valley Primary School

Shadwell Court, Thetford, Norfolk

Client: Domestic

A refurbishment of a Grade I listed building. The new roof coverings were a lead grey Sarnafil PVC single ply system, fully adhered to a plywood decking, with all laps hot air welded. The finished system incorporated a 20 year single point insurance backed manufacturer’s warranty.

Shadwell Court Shadwell Court Shadwell Court Shadwell Court Shadwell Court Shadwell Court